ISO/IEC 27001:2022 and
DPDP Readiness Audit
Document control
Version history
| Version | Date | Status | Description |
|---|---|---|---|
| 0.1 | 16 Oct 2026 | Draft | Interim note of Major nonconformity shared with CISO at the end of fieldwork week 1 |
| 0.9 | 27 Oct 2026 | Draft | Full draft for factual accuracy |
| 1.0 | 30 Oct 2026 | Final | Issued |
Contents
- 1. Executive summary3
- 2. Scope, criteria and approach4
- 3. Management system conformity (clauses 4 to 10)5
- 4. Annex A control conformity (selected controls)7
- 5. Nonconformities and corrective action plan8
- 6. DPDP Act readiness11
- 7. Certification-readiness verdict13
- 8. Roadmap13
- Annex A. Evidence register14
- Annex B. Glossary14
- Annex C. Sign-off14
1. Executive summary
Example Finserv has a working ISMS with real strengths: committed leadership, a sound risk method, good technical controls and a responsive security team. Most gaps are about evidence, testing and keeping records current. One Major nonconformity (internal audit) must be closed before a certification body visits.
Of the 25 clause areas assessed, 15 conform fully, 8 conform with observations, 1 carries a minor nonconformity and 1 a major nonconformity. Of the 33 Annex A controls sampled, 19 conform fully.
Strengths
- Board-level ownership of information security, with a quarterly report from the CISO.
- Risk assessment covers 64 assets and is repeated after significant change.
- Strong endpoint, identity and monitoring controls: MFA on remote access, EDR on 98% of endpoints, 24x7 SOC.
- Pre-release penetration testing by a CERT-In empanelled auditor for every internet-facing release.
What needs attention
- Assurance loop. Internal audits skipped the technology controls and the DR site (NC-01). Without them the management review is working with less evidence than it should.
- Proving that controls work. Backup restore and DR tests (NC-03), log retention (NC-04) and supplier assessments (NC-05) need records.
- Personal data. The DPDP Act adds duties that the ISMS does not yet cover: granular consent, rights handling, and a Board and Data Principal breach notification step. Several obligations commence in phases under the Rules (see section 6).
2. Scope, criteria and approach
2.1 Audit scope and objectives
- Scope of the ISMS: design, development, operation and support of the retail lending platform and its supporting infrastructure, at the head office and one data centre, including the DSA portal and cloud-hosted workloads.
- Objectives: determine conformity to ISO/IEC 27001:2022 clauses 4 to 10 and selected Annex A controls, assess readiness against the DPDP Act, and give a verdict on certification readiness with a corrective action plan.
- Locations: head office, primary data centre. The disaster recovery site was in scope for document review only because of a facility access constraint (noted as a limitation).
2.2 Criteria
| Criteria | Version | Use |
|---|---|---|
| ISO/IEC 27001:2022 with Amendment 1:2024 | 2022 and 2024 | Clauses 4 to 10 and Annex A |
| Statement of Applicability | v3.2 | Control selection and status |
| Digital Personal Data Protection Act, 2023 | 2023 | Obligations of Data Fiduciaries, rights of Data Principals |
| DPDP Rules, 2025 | Nov 2025 | Procedural detail, phased commencement |
| CERT-In Directions | 28 Apr 2022 | Logging, time synchronisation, incident reporting |
| Client policies and procedures | Current | Internal requirements |
2.3 Approach and sampling
| Method | What we did | Sample |
|---|---|---|
| Document review | Policies, procedures, registers, records | 63 documents |
| Interviews | Top management, ISMS manager, control and process owners, HR, procurement, IT | 22 people |
| Observation | Operational practice, physical areas, SOC dashboard | 6 walkthroughs |
| Technical sampling | Configuration checks on logging, retention, NTP, access, backup, TLS | 22 log sources, 20 change records, 25 leavers, 10 supplier contracts, 8 releases |
| Evidence testing | Re-performance of reviews and approvals | Per control |
Sampling followed a risk-based approach: higher criticality systems and processes were sampled more heavily. Sample sizes are stated in the evidence for each finding. Audit time was 24 auditor-days over 2 weeks.
2.4 Classification of results
| Result | Meaning |
|---|---|
| Conforms | Requirement met with objective evidence |
| Observation | Met, but an improvement opportunity or an early risk was noted |
| Minor NC | A requirement is not fully met; isolated or limited lapse. Corrective action required |
| Major NC | Requirement not met, or a systemic failure that undermines the ISMS or its ability to achieve intended outcomes. Corrective action required before certification |
| N/A | Not applicable or not yet in force |
2.5 Limitations
- Findings are based on a sample and on evidence made available at the time of the audit.
- DR site assessed by documents only.
- DPDP assessment is a readiness view and not legal advice. Commencement of different provisions follows the Government's notification and the Rules.
3. Management system conformity (clauses 4 to 10)
| Clause | Requirement | Evidence examined and result | Result |
|---|---|---|---|
| 4.1 | Understanding the organisation and its context | Context register reviewed (v2.1, dated Mar 2026), covers regulatory, technology and market issues. Climate change considered as a relevant issue as required by Amendment 1:2024; record present. | Conforms |
| 4.2 | Needs and expectations of interested parties | Interested-party register lists regulators (RBI, CERT-In, DPB), customers, partners, DSAs, auditors. Requirements mapped. Climate-related requirements assessed. | Conforms |
| 4.3 | Scope of the ISMS | Scope statement covers lending platform, back-office and supporting infrastructure at two locations. One cloud service and DSA portal described as boundary interfaces. | Conforms |
| 4.4 | ISMS and its processes | Process map available; interactions defined. Two process owners were unable to explain inputs and outputs. | Observation |
| 5.1 | Leadership and commitment | Board minutes show approval of the policy and budget; CISO reports quarterly. | Conforms |
| 5.2 | Information security policy | Policy v4.0 approved and communicated. Staff interviews (9 of 9) aware of the policy. | Conforms |
| 5.3 | Roles, responsibilities and authorities | RACI in place for CISO, ISMS manager, asset and risk owners. Deputy for CISO not formally named. | Observation |
| 6.1.1 | Actions to address risks and opportunities | Risk methodology and criteria documented, aligned to enterprise risk appetite. | Conforms |
| 6.1.2 | Information security risk assessment | Risk register covers 64 assets and 118 risks; assessed in January 2026. Repeatable scoring method in use. | Conforms |
| 6.1.3 | Information security risk treatment | Treatment plan approved. Statement of Applicability (v3.2) lists all 93 controls, but 14 inclusion or exclusion decisions have no rationale and 6 controls are marked implemented without evidence reference. | Minor NC |
| 6.2 | Information security objectives and planning to achieve them | 9 objectives, measurable, owners and dates assigned, tracked quarterly. | Conforms |
| 6.3 | Planning of changes | Change procedure refers to ISMS impact. Two of five sampled changes lacked ISMS impact notes (introduced as a clause by Amendment 1:2024). | Observation |
| 7.1 | Resources | Security budget approved; tooling in place. | Conforms |
| 7.2 | Competence | Competence matrix and training records for ISMS roles. 3 of 12 certificates expired. | Observation |
| 7.3 | Awareness | Induction and annual training; completion 91% (target 95%). | Observation |
| 7.4 | Communication | Communication plan defines what, when, whom and how. Evidence of use present. | Conforms |
| 7.5 | Documented information | Document control system in place, version history intact, access controlled. | Conforms |
| 8.1 | Operational planning and control | Operational controls documented; outsourced processes identified (SOC, cloud). | Conforms |
| 8.2 | Information security risk assessment (operation) | Risk assessment repeated after the platform release in June 2026. | Conforms |
| 8.3 | Information security risk treatment (operation) | Treatment plan tracked monthly; 79% actions closed against schedule. | Conforms |
| 9.1 | Monitoring, measurement, analysis and evaluation | Metrics defined for 9 objectives; 7 reported quarterly, 2 not reported in Q2. | Observation |
| 9.2 | Internal audit | Audit programme exists but the technology controls (Annex A.8) and the disaster recovery site were not audited in the last 12 months. Auditor independence not evidenced for two audits. See NC-01. | Major NC |
| 9.3 | Management review | Reviews held in Feb and Aug 2026 with required agenda items. Inputs lacked internal audit results (see NC-01). | Observation |
| 10.1 | Continual improvement | Improvement log with 22 entries, 15 closed. | Conforms |
| 10.2 | Nonconformity and corrective action | Corrective action procedure followed for 11 of 12 sampled incidents; root cause recorded in 9. | Observation |
4. Annex A control conformity (selected controls)
The 93 controls of Annex A are grouped into organisational (37), people (8), physical (14) and technological (34) themes. We sampled the controls most relevant to a lending business and the risks in the risk register. Controls not listed were reviewed through the SoA only.
| Control | Title | Evidence examined and result | Result |
|---|---|---|---|
| A.5.1 | Policies for information security | Policy set reviewed annually; approved by management. | Conforms |
| A.5.7 | Threat intelligence | Subscription to CERT-In advisories and a commercial feed; monthly review recorded. | Conforms |
| A.5.9 | Inventory of information and other associated assets | Asset register covers 94% of sampled items. Cloud assets reconciled quarterly. | Observation |
| A.5.15 | Access control | Access control policy in place; role matrix for lending platform reviewed. | Conforms |
| A.5.16 | Identity management | Joiner, mover, leaver process followed for 24 of 25 sampled leavers within 24 hours. | Observation |
| A.5.18 | Access rights | Quarterly access reviews performed for 3 of 4 critical systems; the DSA portal review was skipped in Q2. | Observation |
| A.5.19 | Information security in supplier relationships | Supplier policy exists. 6 of 25 critical suppliers lack a security assessment on file. See NC-05. | Minor NC |
| A.5.23 | Information security for use of cloud services | Cloud shared-responsibility matrix documented; configuration reviews quarterly. | Conforms |
| A.5.24 | Incident management planning and preparation | Incident response plan v3.0, roles named, tested by tabletop in April 2026. | Conforms |
| A.5.26 | Response to information security incidents | 5 of 5 sampled incidents handled per procedure, with lessons learned. | Conforms |
| A.5.29 | Information security during disruption | BCP security requirements included. Alternate site controls reviewed. | Conforms |
| A.5.30 | ICT readiness for business continuity | Disaster recovery test for the core lending system not performed in the last 12 months. See NC-03. | Minor NC |
| A.5.31 | Legal, statutory, regulatory and contractual requirements | Register includes IT Act, CERT-In Directions, RBI directions, DPDP Act. Owner assigned. | Conforms |
| A.5.34 | Privacy and protection of PII | Privacy policy and notice exist. No record of processing activities that maps to DPDP requirements. See section 6. | Observation |
| A.6.3 | Information security awareness, education and training | Phishing simulation conducted quarterly; click rate 6.2%, down from 9.8%. | Conforms |
| A.6.8 | Information security event reporting | Staff know the reporting channel. 214 reports in 12 months. | Conforms |
| A.7.2 | Physical entry | Badge access logs reviewed monthly at the data centre; visitor logs complete. | Conforms |
| A.7.4 | Physical security monitoring | CCTV retention is 30 days. Policy asks for 90 days. | Observation |
| A.8.1 | User endpoint devices | Endpoint standard enforced through MDM on 97% of devices. | Conforms |
| A.8.2 | Privileged access rights | Privileged access managed through a vault with approval and session recording. 2 dormant admin accounts found. | Observation |
| A.8.5 | Secure authentication | MFA enforced for remote access and administrators. Legacy authentication still allowed on one protocol. | Observation |
| A.8.7 | Protection against malware | EDR on 98% of endpoints; email gateway sandboxing active. | Conforms |
| A.8.8 | Management of technical vulnerabilities | Monthly scans, annual penetration test by an empanelled auditor. Critical patches closed within SLA in 19 of 21 cases. | Observation |
| A.8.9 | Configuration management | Hardening baselines exist for operating systems and databases; drift checks monthly. | Conforms |
| A.8.13 | Information backup | Backups run daily with success monitoring. Restore test for the core lending database not evidenced for the last 12 months. See NC-03. | Minor NC |
| A.8.15 | Logging | Logs centralised in SIEM. Retention is 90 days for 6 of 22 sampled sources, against the organisation's own 180 day requirement. See NC-04. | Minor NC |
| A.8.16 | Monitoring activities | 24x7 monitoring by an external SOC; monthly reports reviewed. | Conforms |
| A.8.20 | Networks security | Segmentation between corporate, production and DSA zones verified on firewall rules. | Conforms |
| A.8.24 | Use of cryptography | Cryptography standard in place; TLS 1.2 or above on tested services; key management procedure documented. | Conforms |
| A.8.25 | Secure development life cycle | SDLC policy with security gates. Security sign-off recorded for 7 of 8 sampled releases. | Observation |
| A.8.28 | Secure coding | Secure coding guidelines issued; static analysis in the pipeline for two of five repositories. | Observation |
| A.8.29 | Security testing in development and acceptance | Pre-release VAPT performed for all internet-facing releases in the last 12 months. | Conforms |
| A.8.32 | Change management | Change records sampled (n=20) show approvals and rollback plans. One emergency change closed late. | Conforms |
Summary of 33 sampled controls: 19 conform, 10 conform with observations, 4 minor nonconformities (NC-02 to NC-05 in part), 0 major.
5. Nonconformities and corrective action plan
Each nonconformity is stated against the requirement, supported by evidence and root cause analysis, and paired with a corrective action plan. Closure will be verified by Virtual Caim before the certification body is booked.
NC-01 Clause 9.2 Internal audit Major NC
NC-02 Clause 6.1.3(d) Statement of Applicability Minor NC
NC-03 Annex A.8.13 Information backup and A.5.30 ICT readiness for business continuity Minor NC
NC-04 Annex A.8.15 Logging Minor NC
NC-05 Annex A.5.19 and A.5.20 Supplier relationships Minor NC
Observations and opportunities for improvement
| Ref | Observation | Suggestion |
|---|---|---|
| OFI-01 | Process owners unable to explain inputs and outputs (4.4) | Brief owners and add process map to induction |
| OFI-02 | Deputy for CISO not named (5.3) | Name a deputy |
| OFI-03 | 3 of 12 competence certificates expired (7.2) | Renewal tracker |
| OFI-04 | Awareness completion 91% (7.3) | Escalate to managers monthly |
| OFI-05 | Two objectives not reported in Q2 (9.1) | Add to dashboard |
| OFI-06 | Two dormant admin accounts (A.8.2) | Disable and add monthly check |
| OFI-07 | Legacy authentication allowed on one protocol (A.8.5) | Disable after impact check |
| OFI-08 | Static analysis on two of five repositories (A.8.28) | Extend coverage |
| OFI-09 | CCTV retention 30 days against 90 day policy (A.7.4) | Align policy or storage |
| OFI-10 | Asset register coverage 94% (A.5.9) | Reconcile with cloud inventory |
6. DPDP Act readiness
The Digital Personal Data Protection Act, 2023 sets duties for a Data Fiduciary, rights for Data Principals and penalties administered by the Data Protection Board of India after inquiry. The Rules were notified in November 2025 with phased commencement; most operative duties, including security safeguards and breach intimation procedure, are scheduled to apply from May 2027. The practical advice is to build now, because consent, rights and breach processes take months to change.
| Provision | Obligation (summary) | Position found | Status | Action |
|---|---|---|---|---|
| s.4 | Lawful purpose: personal data may be processed only with consent or for certain legitimate uses | Purpose register exists for lending and collections. Marketing purposes not separated. | Partly | Separate marketing purpose and record lawful basis per purpose |
| s.5, Rule 3 | Notice: itemised description of data and purpose, with how to exercise rights and complain | Privacy notice published in English only. Does not list rights process or Board complaint route. | Partly | Update notice; offer English or an Eighth Schedule language |
| s.6 | Consent: free, specific, informed, unconditional, unambiguous; withdrawal as easy as giving | Consent captured as a bundled tick box at onboarding. No withdrawal flow in the mobile app. | Gap | Granular consent, withdrawal in app and portal, consent log with version |
| s.7 | Certain legitimate uses (for example, voluntary provision, compliance with law) | Legal basis for regulatory reporting and KYC retention documented. | Met | Keep register current |
| s.8(1), 8(2) | Data Fiduciary is responsible for compliance, including for processing by a Data Processor under a valid contract | Processor list has 18 entries. 4 of 10 sampled contracts lack DPDP terms (see NC-05). | Partly | Contract schedule, annual processor review |
| s.8(3) | Ensure completeness, accuracy and consistency where data is used to decide about the Data Principal or disclosed | Correction workflow for customer master data present; credit decisions use verified sources. | Met | Evidence sampling each year |
| s.8(4) | Appropriate technical and organisational measures to ensure compliance | ISMS controls assessed in sections 3 and 4. Privacy governance has no owner outside IT. | Partly | Name a privacy owner and add DPDP to the ISMS risk method |
| s.8(5), Rule 6 | Reasonable security safeguards to prevent a personal data breach | Controls broadly strong (encryption, access control, MFA, logging). Gaps in log retention and restore testing. | Partly | Close NC-03 and NC-04; confirm vendor log retention for Rule 6 expectations |
| s.8(6), Rule 7 | Intimate a personal data breach to the Board and affected Data Principals, in the prescribed form and manner | Incident plan covers CERT-In 6 hour reporting. No Board and Data Principal notification steps or templates. | Gap | Add breach assessment, notification templates and decision tree; tabletop |
| s.8(7), 8(8) | Erase personal data when consent is withdrawn or the purpose is no longer served, unless law requires retention; ensure processors also erase | Retention schedule exists for 11 of 18 data categories. No automated deletion in lending data store. | Partly | Complete retention schedule; deletion jobs; processor attestations |
| s.8(9) | Publish business contact information of the DPO or a person able to answer Data Principals | Grievance email published on the website; person not named. | Partly | Publish contact details of the named person |
| s.8(10), s.13 | Effective grievance redressal mechanism; right of grievance redressal | Complaint handling exists for RBI Ombudsman matters; no DPDP-specific path or time-bound response. | Partly | Define DPDP grievance flow with response timeline |
| s.9 | Children: verifiable parental consent; no tracking or targeted advertising directed at children | Products are for adults. Age check at onboarding in place. | Met | Document the age-gating decision |
| s.10, Rule 13 | Significant Data Fiduciary (if notified): DPO in India, independent data auditor, periodic impact assessment | Not notified at the date of the audit. Volume and sensitivity could qualify in future. | Check | Prepare DPIA method and auditor shortlist in advance |
| s.11 to s.14 | Rights of Data Principals: access to information, correction and erasure, grievance, nomination | Access and correction handled through branch and email, no tracked workflow, no nomination option. | Gap | Build a rights request workflow with identity verification and SLA |
| s.16 | Transfer of personal data outside India permitted except to countries restricted by the Government | No offshore processing identified. One SaaS tool hosts HR data in a non-India region. | Check | Confirm hosting location and sectoral rules (RBI localisation expectations) |
Readiness score: Met counts 1, Partly 0.5, Gap 0, over 14 assessable obligations = 50%. Items marked Check are excluded. The score is an internal planning aid, not a legal conclusion.
Penalty exposure (for planning)
| Failure | Maximum penalty under the Schedule |
|---|---|
| Failure to take reasonable security safeguards (section 8(5)) | Up to Rs 250 crore |
| Failure to give the Board and affected Data Principals notice of a personal data breach (section 8(6)) | Up to Rs 200 crore |
Penalties are imposed by the Board after inquiry, considering factors listed in the Act. Other breaches carry separate ceilings in the Schedule.
Where ISO/IEC 27001 helps and where it does not
- Helps: risk assessment, access control, logging, supplier management and incident response give a base for Rules on safeguards and breach handling.
- Does not cover: consent management, notices, rights requests, children's data, retention and erasure duties. ISO/IEC 27701 is one option for a privacy information management system on top of the ISMS, or the same controls can be built into the current ISMS risk method.
7. Certification-readiness verdict
| Gate | Condition | Status | Earliest date |
|---|---|---|---|
| Gate 1: Stage 1 ready | NC-01 and NC-02 closed. SoA v3.3 approved. | Open | Week 6 (mid December 2026) |
| Gate 2: Stage 2 ready | NC-03, NC-04, NC-05 closed. Management review held with audit results as input. | Open | Week 12 (late January 2027) |
| Gate 3: DPDP foundation | Consent, rights workflow and breach notification path designed and tested | Open | Before May 2027 commencement |
What the certification body will do
- Stage 1: a document and readiness review of the ISMS (scope, SoA, risk assessment, internal audit, management review).
- Stage 2: an on-site audit of implementation and effectiveness across the scope.
- After certification: surveillance audits in the following years and a recertification audit at the end of the three-year cycle.
Likelihood by area
Likelihood values are the auditors' judgement of readiness at the audit date and are shown to help planning. They are not statistical measures.
8. Roadmap
| Wave | Timeline | Actions | Owner |
|---|---|---|---|
| 1 | 0 to 30 days | NC-02 SoA review; NC-03 restore test; NC-04 retention and NTP; start NC-01 auditor appointments | CISO, Head of IT |
| 2 | 31 to 60 days | NC-01 audits completed; NC-05 supplier assessments and contract schedule; internal audit report to management | ISMS manager, Procurement |
| 3 | 61 to 90 days | DR failover test; management review with audit input; DPDP consent and rights design | CISO, Compliance |
| 4 | 90 to 120 days | Book certification body; DPDP breach notification tabletop; privacy owner appointed | CISO, Compliance |
Follow-up audit
After each nonconformity is reported closed, Virtual Caim performs a follow-up check of the evidence and issues a closure statement. For production-impacting controls, the check includes technical verification. The follow-up is scheduled by the Lead Auditor in agreement with the CISO.
Annex A. Evidence register
| Ref | Evidence | Related result |
|---|---|---|
| EV-01 | Context and interested parties registers v2.1 | 4.1, 4.2 |
| EV-02 | ISMS scope statement and process map | 4.3, 4.4 |
| EV-03 | Board minutes (Feb, Aug 2026) | 5.1, 9.3 |
| EV-04 | Risk register export and method | 6.1.2 |
| EV-05 | Statement of Applicability v3.2 | 6.1.3, NC-02 |
| EV-06 | Internal audit programme and reports IA-2026-01 to 14 | 9.2, NC-01 |
| EV-07 | Restore test and DR test records | A.8.13, A.5.30, NC-03 |
| EV-08 | SIEM retention report, NTP configuration extracts | A.8.15, NC-04 |
| EV-09 | Supplier register, assessments, contracts (10 sampled) | A.5.19, NC-05 |
| EV-10 | Privacy notice, consent forms, processor list | DPDP s.5, s.6, s.8 |
| EV-11 | Incident plan and tabletop report (April 2026) | A.5.24, DPDP s.8(6) |
Annex B. Glossary
| Term | Meaning |
|---|---|
| ISMS | Information security management system |
| SoA | Statement of Applicability: list of Annex A controls, with inclusion, status and justification |
| NC | Nonconformity |
| OFI | Opportunity for improvement |
| Data Fiduciary | Person who determines the purpose and means of processing personal data (DPDP Act) |
| Data Principal | Individual to whom the personal data relates |
| Data Processor | Person who processes personal data on behalf of a Data Fiduciary |
| DPB | Data Protection Board of India |
| SDF | Significant Data Fiduciary, notified by the Central Government |
| DPIA | Data protection impact assessment |
| RTO, RPO | Recovery time objective, recovery point objective |
| NIC, NPL | National Informatics Centre, National Physical Laboratory (time sources named in the CERT-In Directions) |
Annex C. Sign-off
The report is signed by the auditors who conducted the audit, reviewed and signed by a designated reviewer who is not part of the audit team, and authorised by the head of the auditing organisation. Blocks are shown for format only. This sample carries no signatures.